Main Menu

The user can select one of the projects assigned to him for data viewing or data entry. There are 3 options.

Option 1. Record Filing
- Piling information related to Concrete, Grout, Soil, Test Tube and so on.

Option 2. Pile Summary
- A list of pile summary.

Option 3. Detail Summary
- Summary for Concrete, Grout, Soil and Test Tube.

 

See also

1 Logon to iInstrument (Web)
1.1 Projects  
1.11 Project Information
1.2 Transaction (records)
1.21 Update Transaction
1.3  Reports
1.31  Chart System
1.4  My Group
1.5  Change Password
1.6  Update Profile
2.4 Settlement Plate
2.41 Settlement Marker
2.42 Surface Settlement Plate
2.43 Deep Settlement Gauge
2.44 Magnetic Extensometer
2.5 Piezometer
2.51 Pneumatic Piezometer
2.52 Casagrande Piezometer
2.53 Vibrating Wire Piezometer
2.54 Water Standpipe
2.55 Observation Well
2.6 Others
2.61 Cracker Meter
2.62 Inclinometer
2.63 Tiltmeter
2.7 Summary
3 Logon to iMidware (PC)
3.1 iMidware Files Transfer  
4 Logon to iPile (Web)
4.1 Drawing  
4.2 Drawing Obejcts  
4.21 Drawing Obejcts Detail  
4.3 Default Value  
4.4 My Group  
2 Logon to iInstrument (PPC)
2.1 Main Menu  
2.2 Data Entry
2.3 Calendar
5 Logon to iPile (PPC)
5.1 Main Menu  
5.2 Pile Search Screen  
5.3 Inspection  
5.4 Rebar  
5.5 Test Cube  

[ Home ] [ Products ] [ Services ] [ Support ] [ Sitemap ] Useful resources,Construction Link, Construction Systems
powered by Magicsoft